Designing steelmaking plants
Designing, installing, final testing, and launching 500,000-ton Ardestan steel unit
- Designing various parts of the plant, including 75-ton arc furnace (AF) and ladle furnace, smoke suction system, material handling, water supply, casting, and cranes
- Installing, testing, and launching arc furnace (AF), ladle furnace, smoke suction system
- Constructing power substations, installing transformers and medium and low-pressure panels, cabling
- Designing and implementing automation and electrode adjustment system
Installing, testing and launching, operating and maintaining Sina Steel plant
- Installing, testing, and launching a 12-ton induction furnace
- Designing, manufacturing, installing, testing, and launching of two-strand casting line
- Installing the water supply system, smoke suction, new shed, and handling material
- Launching electrical panels and plant automation system
- Operating and maintaining the plants within two years
25-tons arc furnace (AF) of Zob Gostar Qom Company
- Mechanical consultant for arc furnace (AF) and ladle furnace
- Consultant Electric Arc Furnace (EAF) and ladle
- Overhead crane consultant to smelt and molding
Designing and implementing automatic control software (Electric Arc Furnace-EAF) of 180-ton Saba Steel
- Automatic charging of materials
- Pulse voltage and current control arc furnace (AF)
- Bulked slag quality control
- Determining the optimal operating point of the furnace in terms of electrical parameters and production process